2024 SSMH Liners Project

RECEIPT OF BIDS:  Separate sealed BIDS or Electronic Submittal using Bidnet Direct for the construction of 2024 SSMH Liners Project will be received by Taggart Bowen, Acting City Engineer at the City of Orem, Engineering Division, 56 North State, Orem, UT 84057, or opened electronically on Bidnet Direct until March 21, 2024 at 3:00 P.M. and then at said office publicly opened and read aloud. The preferred method for submitting a bid is by using Bidnet Direct at bidnetdirect.com (Select the search bar > > enter “City of Orem” > Enter).

BIDDING QUESTIONS – Use Bidnet Direct to submit questions and download documents relating to bid items, specifications, and other technical questions. The project manager is Kyra Wright,(801)229-7315.

OBTAINING CONTRACT DOCUMENTS:  The CONTRACT DOCUMENTS may be obtained February 29, 2024 on Bidnet Direct or at the City of Orem, Engineering Division, Development Services Offices, 56 North State Street, Orem, UT 84057. There is no fee from the City to obtain the documents on Bidnet Direct. There will be a $20 non-refundable fee for a copy of the plans and specification. (An additional $5.00 service charge will be assessed if the plans and specifications are to be mailed).

DESCRIPTION OF WORK:  The WORK will consist of lining 30 sewer manholes with a sprayed-on process for rehabilitation purposes. The engineer’s estimate for the work is $100,000 to $115,000.

SITE OF WORK:  The site of the WORK is located at 144 N Geneva Road, Links at Sleepy Ridge Golf Course (980 S 2040 W), 750 W 1200 S, 775 W 1200 S, 800 W University Pkwy, 801 W University Pkwy, 815 W College Drive, 900 W College Drive, 1000 S College Drive, 800 S 1200, 723 S 1200 W, 1200 W 400 S, 400 N 1200 W, 400 N 1200 W , 850 N 1200 W, 1054 N 1200 W, 1200 N 1200 W, 750 E 800 S, 950 W 1600 N, 800 S 400 E , 1350 N Geneva Road, 1340 N Geneva Road, 500 S 900 E, 500 N 680 W, and State street from 300 North to 700 North.

2023 Roadway Project

RECEIPT OF BIDS:  Separate sealed BIDS or Electronic Submittal using Bidnet Direct for the construction of the 2023 Roadway Project will be received by Sam Kelly, City Engineer at the City of Orem, Engineering Division, 56 North State, Orem, UT 84057, or opened electronically on Bidnet Direct until April 20, 2023 at 10:00 am and then at said office publicly opened and read aloud. The preferred method for submitting a bid is by using Bidnet Direct at bidnetdirect.com (Select the search bar > > enter “City of Orem” > Enter).

BIDDING QUESTIONS – Use Bidnet Direct to submit questions and download documents relating to bid items, specifications, and other technical questions. The project engineer isTom Nisson, 801-229-7331. A mandatory pre-bid meeting will be held on April 6, 2023 at 2:00 pm at the City Center, 56 North State Street, Orem, UT 84057 in the Development Services Conference Room.

OBTAINING CONTRACT DOCUMENTS:  The CONTRACT DOCUMENTS may be obtained March 30, 2023 on Bidnet Direct or at the City of Orem, Engineering Division, Development Services Offices, 56 North State Street, Orem, UT 84057. There is no fee from the City to obtain the documents on Bidnet Direct. There will be a $20.00 non-refundable fee for a copy of the plans and specification. (An additional $5.00 service charge will be assessed if the plans and specifications are to be mailed).

DESCRIPTION OF WORK:  The WORK includes 89,180 square yards of 1 ½” edge mill with a 2” overlay, 4,210 square yards of a 2” profile mill with a 2” overlay, 13,000 square yards of roadway excavation and roadway reconstruction, 3,000 tons of leveling course, adjusting approximately 132 manholes and 142 water valves to grade with concrete collars. The WORK also includes storm improvements, which include the installation of 2 standard box’s, 7 pre-treatments, 3 storm manholes, 7 3×3 storm boxes, 185 linear feet of 12” storm pipe, 605 linear feet of 15” RCP storm pip, 1,015 linear feet of 18” RCP storm pipe, and other various improvements. The engineer’s estimate for the work is $3,200,000 to $3,600,000.

SITE OF WORK:  The site of the WORK is located at 1200 S. (College Way to State St.), 800 S. (State Street to 800 East), 400 S. (Orem Blvd. to State St.), 1500 W. (Center St. to 130 S.) 130 S. (1500 W. to Mountain Way Dr.), 1600 N. (400 E. to 800 E.), and Skyline Dr. (1600 N. to Heather Rd.)