2025 Crack Seal Project

RECEIPT OF BIDS:  Separate sealed BIDS or Electronic Submittal using Bidnet Direct for the work of the 2025 Crack Seal Project will be received by Taggart Bowen, City Engineer at the City of Orem, Engineering Division, 56 North State, Orem, UT 84057, or opened electronically on Bidnet Direct until October 8, 2024 at 2:30pm and then at said office publicly opened and read aloud. The preferred method for submitting a bid is by using Bidnet Direct at bidnetdirect.com (select the search bar > > enter “city of Orem” > Enter).

BIDDING QUESTIONS Please use Bidnet Direct to submit questions and download documents relating to bid items, specifications, and other technical questions. Contact Jet Buxton at (801) 229-7535 or Tom Nisson at (801) 229-7331 for additional questions.

OBTAINING CONTRACT DOCUMENTS: The CONTRACT DOCUMENTS may be obtained September 17, 2024 on Bidnet Direct under 2025 Crack Seal Project or at the City of Orem, Engineering Division, Development Services Offices, 56 North State Street, Orem, UT 84057.  There is no fee from the City to obtain the documents on Bidnet Direct.  There will be a $15 non-refundable fee for a copy of the plans and specifications. (An additional $5.00 service charge will be assessed if the plans and specifications are to be mailed).

DESCRIPTION OF WORK:  The WORK will consist of crack sealing in various locations. The budget is approximately $375,000. SITE OF WORK:  The site of the WORK is located at various locations in Orem.

2024 Roadway Project

RECEIPT OF BIDS: Separate sealed BIDS or Electronic Submittal using Bidnet Direct for the construction of 2024 Roadway Project will be received by Sam Kelly, City Engineer at the City of Orem, Engineering Division, 56 North State, Orem, UT 84057, or opened electronically on Bidnet Direct until February 8th, 2024 at 3:00 pm and then at said office publicly opened and read aloud. The preferred method for submitting a bid is by using Bidnet Direct at https://www.bidnetdirect.com/ (Select the search bar > > enter “City of Orem” > Enter).

BIDDING QUESTIONS – Use Bidnet Direct to submit questions and download documents relating to bid items, specifications, and other technical questions. The project manager is Mauro Choquevillca, [801-729-3525]. A mandatory pre-bid meeting will be held on January 30th, 2024 at 3:00 pm.

OBTAINING CONTRACT DOCUMENTS: The CONTRACT DOCUMENTS may be obtained January 18th, 2024 on Bidnet Direct or at the City of Orem, Engineering Division, Development Services Offices, 56 North State Street, Orem, UT 84057. There is no fee from the City to obtain the documents on Bidnet Direct. There will be a $20.00 non-refundable fee for a copy of the plans and specification. (An additional $5.00 service charge will be assessed if the plans and specifications are to be mailed).

DESCRIPTION OF WORK: The WORK includes the installation of 3 standard sumps, 1 standard box catch basin, 2 pre-treatment catch basin, 45 linear feet of 12” SDR35 PVC storm drain pipe, 125 linear feet of 15” Class III RCP storm drain pipe, 87145 square yards asphalt section 1 ½” Edge Mill and 2” Overlay (1/2” PG 64-34), 25534 square yards asphalt section 2” Profile Mill and 2” Overlay (1/2” PG 64-34), 5514 square yards roadway excavation and reconstruction 5” asphalt (1/2” PG 64-34), adjust 118 existing manhole to finished grade w/ concrete collar, adjust 125 existing water valve to finished grade w/ concrete collar, and other various improvements . The engineer’s estimate for the work is $2,500,000 – $3,000,000.

SITE OF WORK: The site of the WORK is located at 2000 N (from Main Street to Heather Road), Main Street (from 800 North to 1600 North), 400 East (from Center Street to 400 South), 400 South (from 400 East to 800 East), 1000 East (from 400 North to Center Street), Center Street (from 1000 East to 1180 East), 1500 West (Center Street to 130 South), 130 South (from 1500 West to South Mountain Way Dr), 200 East (from 1400 South to 1600 South), and Key Ridge Circle.

2024 ADA Ramp Project

RECEIPT OF BIDS: Separate sealed BIDS or Electronic Submittal using Bidnet Direct for the construction of 2024 ADA Ramp Project will be received by Sam Kelly, City Engineer at the City of Orem, Engineering Division, 56 North State, Orem, UT 84057, or opened electronically on Bidnet Direct until October 3rd, 2023 at 3:00 pm and then at said office publicly opened and read aloud. The preferred method for submitting a bid is by using Bidnet Direct at https://www.bidnetdirect.com/ (Select the search bar > > enter “City of Orem” > Enter).

BIDDING QUESTIONS – Use Bidnet Direct to submit questions and download documents relating to bid items, specifications, and other technical questions. The project manager is Mauro Choquevillca, [801-724-3525]. A mandatory pre-bid meeting will be held on September 20th, 2023 at 3:00 pm.

OBTAINING CONTRACT DOCUMENTS: The CONTRACT DOCUMENTS may be obtained September 12th, 2023 on Bidnet Direct or at the City of Orem, Engineering Division, Development Services Offices, 56 North State Street, Orem, UT 84057. There is no fee from the City to obtain the documents on Bidnet Direct. There will be a $10.00 non-refundable fee for a copy of the plans and specification. (An additional $5.00 service charge will be assessed if the plans and specifications are to be mailed).

DESCRIPTION OF WORK: The WORK includes the installation of 48 modified ADA ramps, 4 quarter round ADA ramps, 265 linear feet of 6’ monolithic sidewalk, curb & gutter, 75 feet of 6’ monolithic drive approach, and 90 linear feet of concrete cross gutter. The engineer’s estimate is for the work $450,000 – $500,000.

SITE OF WORK: The site of the WORK is located at Main Street (from 800 North to 1600 North) and 2000 North (from Main Street to Heather Road).

2023 Roadway Project

RECEIPT OF BIDS:  Separate sealed BIDS or Electronic Submittal using Bidnet Direct for the construction of the 2023 Roadway Project will be received by Sam Kelly, City Engineer at the City of Orem, Engineering Division, 56 North State, Orem, UT 84057, or opened electronically on Bidnet Direct until April 20, 2023 at 10:00 am and then at said office publicly opened and read aloud. The preferred method for submitting a bid is by using Bidnet Direct at bidnetdirect.com (Select the search bar > > enter “City of Orem” > Enter).

BIDDING QUESTIONS – Use Bidnet Direct to submit questions and download documents relating to bid items, specifications, and other technical questions. The project engineer isTom Nisson, 801-229-7331. A mandatory pre-bid meeting will be held on April 6, 2023 at 2:00 pm at the City Center, 56 North State Street, Orem, UT 84057 in the Development Services Conference Room.

OBTAINING CONTRACT DOCUMENTS:  The CONTRACT DOCUMENTS may be obtained March 30, 2023 on Bidnet Direct or at the City of Orem, Engineering Division, Development Services Offices, 56 North State Street, Orem, UT 84057. There is no fee from the City to obtain the documents on Bidnet Direct. There will be a $20.00 non-refundable fee for a copy of the plans and specification. (An additional $5.00 service charge will be assessed if the plans and specifications are to be mailed).

DESCRIPTION OF WORK:  The WORK includes 89,180 square yards of 1 ½” edge mill with a 2” overlay, 4,210 square yards of a 2” profile mill with a 2” overlay, 13,000 square yards of roadway excavation and roadway reconstruction, 3,000 tons of leveling course, adjusting approximately 132 manholes and 142 water valves to grade with concrete collars. The WORK also includes storm improvements, which include the installation of 2 standard box’s, 7 pre-treatments, 3 storm manholes, 7 3×3 storm boxes, 185 linear feet of 12” storm pipe, 605 linear feet of 15” RCP storm pip, 1,015 linear feet of 18” RCP storm pipe, and other various improvements. The engineer’s estimate for the work is $3,200,000 to $3,600,000.

SITE OF WORK:  The site of the WORK is located at 1200 S. (College Way to State St.), 800 S. (State Street to 800 East), 400 S. (Orem Blvd. to State St.), 1500 W. (Center St. to 130 S.) 130 S. (1500 W. to Mountain Way Dr.), 1600 N. (400 E. to 800 E.), and Skyline Dr. (1600 N. to Heather Rd.)