2021 Sewer Rehabilitation Project

RECEIPT OF BIDS:  Separate sealed BIDS or Electronic Submittal using Sciquest for the construction of 2021 Sewer Rehabilitation Project will be received by Sam Kelly, City Engineer at the City of Orem, Engineering Division, 56 North State, Orem, UT  84057, or opened electronically on Sciquest until May 5, 2021 at 10:00 AM, and then at said office publicly opened and read aloud. The preferred method for submitting a bid is by using Sciquest at purchasing.utah.gov (Select the search bar > select Current Bids > enter “Orem” > search). 

BIDDING QUESTIONS – Use Sciquest to submit questions and download documents relating to bid items, specifications, and other technical questions. The project engineer is Carlos Garcia (801) 229-7318. There will be a mandatory pre-bid teleconference on April 22, 2021 at 1:00 pm through Google Meet. Any contractors who wish to attend will need to send an email to clgarcia@orem.org to receive an invitation. It is recommended to use Google Chrome as the browser and have access to a computer/laptop with a microphone.

OBTAINING CONTRACT DOCUMENTS:  The CONTRACT DOCUMENTS may be obtained  April 14, 2021 on SciQuest under 2021 Sewer Rehabilitation Project or at the City of Orem, Engineering Division, Development Services Offices, 56 North State Street, Orem, UT 84057. There is no fee from the City to obtain the documents on SciQuest. There will be a $20.00 non-refundable fee for a copy of the plans and specifications.  (An additional $5.00 service charge will be assessed if the plans and specifications are to be mailed).

DESCRIPTION OF WORK:  The WORK includes 3500 LF of 8” SDR35 PVC Sanitary Sewer Pipe, 24 Sanitary Sewer Manholes, 63 Sewer Lateral Reconnects, 3 Pre-Treatment Catch Basins, 3 Sumps, and 80 LF of 12” SDR35 PVC Storm Drain Pipe. The engineer’s estimate for the work is $1.1M to $1.2M.

SITE OF WORK:  The site of the WORK is located at 200 East (800 North to 1020 North), 1020 (150 East to 200 East), 980 North (130 East to 200 East), Garden Drive (980 North to 910 North), 910 North (Garden Drive to 200 East), 865 North (186 East to 200 East), Center Street (400 East to 450 East), 300 East (Center Street to 400’ South of Center Street), 1773 North 680 West, 18 East 1700 North, 1139 West 50 South, 895 West 1450 South, and 1743 South 145 East.

2021 Roadway Project

RECEIPT OF BIDS:  Separate sealed BIDS or Electronic Submittal using SciQuest for the construction of the 2021 Roadway Project will be received by Sam Kelly, City Engineer at the City of Orem, Engineering Division, 56 North State, Orem, UT 84057, or opened electronically on SciQuest until April 8, 2021 at 11:00 am and then at said office publicly opened and read aloud. The preferred method for submitting a bid is by using SciQuest at purchasing.utah.gov (Select the search bar > select Current Bids > enter “Orem” > search).

BIDDING QUESTIONS – Use SciQuest to submit questions and download documents relating to bid items, specifications, and other technical questions. The project engineer is Kyra Wright (801)-229-7315. A mandatory pre-bid meeting will be held on March 24, 2021 at 8:30 am at the Orem City Center Park South Parking Lot, 293 E Center Street, Orem, all who wish to attend are required to wear a mask and practice social distancing.

OBTAINING CONTRACT DOCUMENTS:  The CONTRACT DOCUMENTS may be obtained March 17, 2021 on SciQuest under Orem City 2021 Roadway Project or at the City of Orem, Engineering Division, Development Services Offices, 56 North State Street, Orem, UT 84057. There is no fee from the City to obtain the documents on SciQuest. There will be a $20 non-refundable fee for a copy of the plans and specifications. (An additional $5.00 service charge will be assessed if the plans and specifications are to be mailed).

DESCRIPTION OF WORK:  The WORK includes 7,940 SY of 3” profile mill with 3” overlay, 12,377 SY of 3.5″ travel lane mill and shoulder mill with 3.5″ Pave, 79,598 SY of 2” edge mill and 2” overlay (1/2” PG 64-34), 1,363 SY of 2” profile mill and 2” overlay, 10 modified ADA ramps, 9 speed tables, 510 LF type B3 concrete curbing, 1585 sf of stamped concrete, 237 utilities brought to finished grade, 3 existing monuments brought to finished grade, 850 CY of granular borrow, 1933 LF OF 2’ curb and gutter, 244 SF of 4” concrete with 4” UTBC, 118 SF of 7” concrete with 4” UTBC, 2 dumpster enclosures, 2 drive approaches, 170 LF of cross gutter, 19 storm drain structures, 425 LF 12” SDR35 PVC, 220 LF of 3” PVC conduit for irrigation install 5 new streetlights, junction boxes, and 455 LF of power conduit. The engineer’s estimate for the work is $2,400,000 to $2,800,000. SITE OF WORK:  The site of the WORK is located at 800 E (From 800 N to Center St.), Palisade Drive (From 800 N to Center St.), 2000 S (From Sandhill Dr. to 140 East), Main St. (From 400 S to 800 S), Orem Fitness Center south parking lot on 165 S 600 W, and City Center Park south parking lot on 300 E Center St