RECEIPT OF BIDS:  Separate sealed BIDS or Electronic Submittal using Bidnet Direct for the construction of the 400 S. To Provo River Storm Project will be received by Sam Kelly, City Engineer at the City of Orem, Engineering Division, 56 North State, Orem, UT 84057, or opened electronically on Bidnet Direct until Thursday, February 7, 2023 at 2:00pm and then at said office publicly opened and read aloud. The preferred method for submitting a bid is by using Bidnet Direct at bidnetdirect.com (Select the search bar > > enter “City of Orem” > Enter).

BIDDING QUESTIONS – Use Bidnet Direct to submit questions and download documents relating to bid items, specifications, and other technical questions. The project engineer is Tom Nisson,801-229-7331. A mandatory pre-bid meeting will be held on January 24, 2023 at 10:00 am at the Orem City Center located at 56 N State St, Orem UT, 84057.

OBTAINING CONTRACT DOCUMENTS: The CONTRACT DOCUMENTS may be obtained January 13, 2023 on Bidnet Direct or at the City of Orem, Engineering Division, Development Services Offices, 56 North State Street, Orem, UT 84057. There is no fee from the City to obtain the documents on Bidnet Direct. There will be a $20.00 non-refundable fee for a copy of the plans and specification. (An additional $5.00 service charge will be assessed if the plans and specifications are to be mailed).

DESCRIPTION OF WORK:  The WORK includes the installation of 2 48” storm drain manholes, 9 60” storm drain manholes, 2 72” storm drain manholes, 3 pre-treatments, 1,140 linear feet of 30” RCP storm drain pipe, 590 linear feet of 30” HDPE storm drain line, and other storm improvements.

SITE OF WORK:  The site of the WORK is located at 400 S. from 1000 E. to Carterville Rd. and from Carterville Rd. and 400 S. to 447 S. Carterville Rd. and from 447 S. Carterville Rd. to the Provo River.

Recommended Posts