B. Hansen Construction Inc………………….$156,003.25

R. Cherrington Enterprises, LLC……….…….$161,620.00

Beck Construction & Excavation, Inc………..$199,250.00

Geneva Rock Products………………..….…..$240,840.00

RECEIPT OF BIDS: Separate sealed BIDS or Electronic Submittal using Sciquest for the construction of 2020 Traffic Improvements Project will be received by Sam Kelly, City Engineer at the City of Orem, Engineering Division, 56 North State, Orem, UT 84057, or opened electronically on Sciquest until November 19, 2020 at 10 amand then at said office publicly opened and read aloud. The preferred method for submitting a bid is by using Sciquest at purchasing.utah.gov (Select the search bar > select Current Bids > enter “Orem” > search).

Due to the following circumstances due to COVID-19, attendance for the pre-bid meeting will not be required to submit a bid. While the meeting is not mandatory, it is highly encouraged for contractors to attend to ask any questions and to further understand the scope of the project. In lieu of meeting at the City Center, a teleconference will be held on November 12, 2020 at 10 am. Any contractors that wish to attend will need to send an email to zjfisher@orem.org to receive an invitation. Once the invitation is received, you will need to create a username and password, and login to be connected to the meeting. On the day of the teleconference, ensure that you use Google Chrome as the browser as well as have access to a computer/laptop with a microphone.


BIDDING QUESTIONS – Use Sciquest to submit questions and download documents relating to bid items, specifications, and other technical questions. The project engineer is Zack Fisher (801) 229-7331.


OBTAINING CONTRACT DOCUMENTS: The CONTRACT DOCUMENTS may be obtained November 5, 2020 on Sciquest under 2020 Traffic Improvements Project or at the City of Orem, Engineering Division, Development Services Offices, 56 North State Street, Orem, UT 84057. There is no fee from the City to obtain the documents on Sciquest. There will be a $20 non-refundable fee for a copy of the plans and specifications. (An additional $5.00 service charge will be assessed if the plans and specifications are to be mailed).
DESCRIPTION OF WORK: The WORK includes 820 linear feet of Type B3 Concrete Curb, 385 square feet of concrete flatwork, 200 linear feet of 2’ of curb and gutter, 2 plowable end sections, 2 irrigation boxes, 74 linear feet of 24” x 18” CMP irrigation pipe, 2 modified ADA ramps, 1 ADA ramp, and striping. The engineer’s estimate is for the work $160,000 to $180,000.


SITE OF WORK: The site of the WORK is located at 800 East (875 North to 700 North) and Center Street (State Street to 150 East).